Industrial Ovens

Drying and curing ovens built around our duct heaters and controls.

Industrial drying oven

Operating conditions

Include these details when requesting a quotation.

Powerto your duty
Voltage3 ph · 50 / 60 Hz · per site supply
Mediumproduct and chamber size
Working temp.chamber temperature and uniformity
Materialselected for the medium
Ex ratingif required

Tested before it ships

Every unit goes through the same electrical checks at the Yancheng plant. The results are recorded per heater and the test record ships with it.

  1. Insulation resistanceMeasured cold and hot between live parts and the earthed housing.
  2. Dielectric strengthHigh-voltage withstand test between live parts and earth.
  3. Leakage currentMeasured at rated voltage.
  4. Power checkResistance and power measured against the rating plate.
Electrical safety analyser reading 448 V and 0.000 mA during a dielectric and leakage test
Dielectric strength and leakage current on the electrical safety analyser
Technician testing heating elements at the inspection bench
Element bundle wired to the test bench

Certificates

Product certificates, patents and management systems held by the Sinton plants. Open any document for the full scan, issuer and validity.

All certificates

Request a quote

Include your operating temperature and power supply. You can attach a drawing or datasheet.

What do you need to heat?
Add operating conditions or a drawing (optional)
Drawing or datasheet (PDF, DWG, DXF, PNG or JPEG, up to 5 MB)

Your details are used only to answer this inquiry.

Get a quote Email